Electric Railroad
   HOME

TheInfoList



OR:

A railway electrification system supplies
electric power Electric power is the rate at which electrical energy is transferred by an electric circuit. The SI unit of power is the watt, one joule per second. Standard prefixes apply to watts as with other SI units: thousands, millions and billions o ...
to railway trains and trams without an on-board prime mover or local fuel supply. Electric railways use either electric locomotives (hauling passengers or freight in separate cars),
electric multiple unit An electric multiple unit or EMU is a multiple-unit train consisting of self-propelled carriages using electricity as the motive power. An EMU requires no separate locomotive, as electric traction motors are incorporated within one or a numbe ...
s ( passenger cars with their own motors) or both. Electricity is typically generated in large and relatively efficient generating stations, transmitted to the railway network and distributed to the trains. Some electric railways have their own dedicated generating stations and transmission lines, but most purchase power from an electric utility. The railway usually provides its own distribution lines, switches, and transformers. Power is supplied to moving trains with a (nearly) continuous
conductor Conductor or conduction may refer to: Music * Conductor (music), a person who leads a musical ensemble, such as an orchestra. * ''Conductor'' (album), an album by indie rock band The Comas * Conduction, a type of structured free improvisation ...
running along the track that usually takes one of two forms: an overhead line, suspended from poles or towers along the track or from structure or tunnel ceilings, or a third rail mounted at track level and contacted by a sliding " pickup shoe". Both overhead wire and third-rail systems usually use the running rails as the return conductor, but some systems use a separate fourth rail for this purpose. In comparison to the principal alternative, the diesel engine, electric railways offer substantially better energy efficiency, lower emissions, and lower operating costs. Electric locomotives are also usually quieter, more powerful, and more responsive and reliable than diesels. They have no local emissions, an important advantage in tunnels and urban areas. Some electric traction systems provide regenerative braking that turns the train's kinetic energy back into electricity and returns it to the supply system to be used by other trains or the general utility grid. While diesel locomotives burn petroleum products, electricity can be generated from diverse sources, including
renewable energy Renewable energy is energy that is collected from renewable resources that are naturally replenished on a human timescale. It includes sources such as sunlight, wind, the movement of water, and geothermal heat. Although most renewable energy ...
.P. M. Kalla-Bishop, ''Future Railways and Guided Transport'', IPC Transport Press Ltd. 1972, pp. 8-33 Historically concerns of resource independence have played a role in the decision to electrify railway lines. The landlocked Swiss confederation which almost completely lacks oil or coal deposits but has plentiful hydropower electrified its network in part in reaction to supply issues during both World Wars. Disadvantages of electric traction include: high capital costs that may be uneconomic on lightly trafficked routes, a relative lack of flexibility (since electric trains need third rails or overhead wires), and a vulnerability to power interruptions. Electro-diesel locomotives and electro-diesel multiple units mitigate these problems somewhat as they are capable of running on diesel power during an outage or on non-electrified routes. Different regions may use different supply voltages and frequencies, complicating through service and requiring greater complexity of locomotive power. There used to be a historical concern for double-stack rail transport regarding clearances with overhead lines but it is no longer universally true , with both Indian Railways and
China Railway China State Railway Group Company, Ltd., doing business as China Railway (CR), is the national passenger and freight railroad corporation of the People's Republic of China. China Railway operates passenger and freight transport throughout Ch ...
regularly operating electric double-stack cargo trains under overhead lines. Railway electrification has constantly increased in the past decades, and as of 2012, electrified tracks account for nearly one-third of total tracks globally.


Classification

Electrification systems are classified by three main parameters: * Voltage * Current ** Direct current (DC) ** Alternating current (AC) *** Frequency * Contact system ** Overhead lines (catenary) ** Third rail ** Fourth rail ** Ground-level power supply Selection of an electrification system is based on economics of energy supply, maintenance, and capital cost compared to the revenue obtained for freight and passenger traffic. Different systems are used for urban and intercity areas; some electric locomotives can switch to different supply voltages to allow flexibility in operation.


Standardised voltages

Six of the most commonly used voltages have been selected for European and international standardisation. Some of these are independent of the contact system used, so that, for example, 750VDC may be used with either third rail or overhead lines. There are many other voltage systems used for railway electrification systems around the world, and the list of railway electrification systems covers both standard voltage and non-standard voltage systems. The permissible range of voltages allowed for the standardised voltages is as stated in standards BSEN50163 and IEC60850. These take into account the number of trains drawing current and their distance from the substation.


Direct current


Overhead systems

1,500V DC is used in Japan, Indonesia, Hong Kong (parts), Ireland, Australia (parts), France (also using , New Zealand ( Wellington), Singapore (on the
North East MRT Line The North East MRT line (NEL) is a high-capacity Mass Rapid Transit (MRT) line in Singapore. Operated by SBS Transit, it is the shortest MRT line at . The line runs from HarbourFront station in southern Singapore to Punggol station in the n ...
), the United States ( Chicago area on the Metra Electric district and the South Shore Line interurban line and Link light rail in Seattle, Washington). In Slovakia, there are two narrow-gauge lines in the High Tatras (one a cog railway). In the Netherlands it is used on the main system, alongside 25kV on the HSL-Zuid and Betuwelijn, and 3,000V south of Maastricht. In Portugal, it is used in the Cascais Line and in Denmark on the suburban S-train system (1650V DC). In the United Kingdom, 1,500VDC was used in 1954 for the Woodhead trans-Pennine route (now closed); the system used regenerative braking, allowing for transfer of energy between climbing and descending trains on the steep approaches to the tunnel. The system was also used for suburban electrification in
East London East or Orient is one of the four cardinal directions or points of the compass. It is the opposite direction from west and is the direction from which the Sun rises on the Earth. Etymology As in other languages, the word is formed from the f ...
and Manchester, now converted to 25kVAC. It is now only used for the Tyne and Wear Metro. In India, 1,500V DC was the first electrification system launched in 1925 in Mumbai area. Between 2012 and 2016, the electrification was converted to 25kV 50Hz, which is the countrywide system. 3kV DC is used in Belgium, Italy, Spain, Poland, Slovakia, Slovenia, South Africa, Chile, the northern portion of the Czech Republic, the former republics of the Soviet Union, and in the Netherlands on a few kilometers between Maastricht and Belgium. It was formerly used by the
Milwaukee Road The Chicago, Milwaukee, St. Paul and Pacific Railroad (CMStP&P), often referred to as the "Milwaukee Road" , was a Class I railroad that operated in the Midwestern United States, Midwest and Pacific Northwest, Northwest of the United States fr ...
from Harlowton, Montana, to Seattle, across the Continental Divide and including extensive branch and loop lines in Montana, and by the
Delaware, Lackawanna and Western Railroad The Delaware, Lackawanna and Western Railroad (also known as the DL&W or Lackawanna Railroad) was a U.S. Class 1 railroad that connected Buffalo, New York, and Hoboken, New Jersey (and by ferry with New York City), a distance of . Incorporated in ...
(now New Jersey Transit, converted to 25kVAC) in the United States, and the
Kolkata suburban railway The Kolkata Suburban Railway is a suburban rail system serving the Kolkata metropolitan area and its surroundings in India. It is the largest suburban railway network in the country with the highest number of stations. It is also the 7th larg ...
(Bardhaman Main Line) in India, before it was converted to 25kV 50Hz. DC voltages between 600V and 800V are used by most tramways, trolleybus networks and underground (subway) systems as the traction motors accept this voltage without the weight of an on-board transformer.


Medium-voltage DC

Increasing availability of high-voltage semiconductors may allow the use of higher and more efficient DC voltages that heretofore have only been practical with AC. The use of medium-voltage DC electrification (MVDC) would solve some of the issues associated with standard-frequency AC electrification systems, especially possible supply grid load imbalance and the phase separation between the electrified sections powered from different phases, whereas high voltage would make the transmission more efficient. UIC conducted a case study for the conversion of the Bordeaux-Hendaye railway line (France), currently electrified at 1.5kV DC, to 9kV DC and found that the conversion would allow to use less bulky overhead wires (saving €20 million per 100route-km) and lower the losses (saving 2GWh per year per 100route-km; equalling about €150,000 p.a.). The line chosen is one of the lines, totalling 6000km, that are in need of renewal. In the 1960s the Soviets experimented with boosting the overhead voltage from 3 to 6kV. DC rolling stock was equipped with ignitron-based converters to lower the supply voltage to 3kV. The converters turned out to be unreliable and the experiment was curtailed. In 1970 experimental works on system proved a.o. that the equivalent loss levels for a system could be achieved with DC voltage between 11 and 16kV. In the 1980s and 1990s experimental system was being tested on the October Railway near Leningrad (now
Petersburg Petersburg, or Petersburgh, may refer to: Places Australia *Petersburg, former name of Peterborough, South Australia Canada * Petersburg, Ontario Russia *Saint Petersburg, sometimes referred to as Petersburg United States *Peterborg, U.S. Virg ...
). The experiments ended in 1995 due to the end of funding.


Third rail

Most electrification systems use overhead wires, but third rail is an option up to 1,500V. Third rail systems almost exclusively use DC distribution. The use of AC is usually not feasible due to the dimensions of a third rail being physically very large compared with the skin depth that AC penetrates to in a steel rail. This effect makes the resistance per unit length unacceptably high compared with the use of DC. Third rail is more compact than overhead wires and can be used in smaller-diameter tunnels, an important factor for subway systems.


Fourth rail

The London Underground in England is one of the few networks that uses a four-rail system. The additional rail carries the electrical return that, on third rail and overhead networks, is provided by the running rails. On the London Underground, a top-contact third rail is beside the track, energized at , and a top-contact fourth rail is located centrally between the running rails at , which combine to provide a traction voltage of . The same system was used for Milan's earliest underground line, Milan Metro's
line 1 Line 1 or 1 line may refer to: Public transport Africa * Line 1 (Algiers Metro), Algeria * Cairo Metro Line 1, Egypt Asia China * Line 1 (Beijing Subway) * Line 1 (Changchun Rail Transit) * Line 1 (Changsha Metro) * Line 1 (Changzhou Metro) * L ...
, whose more recent lines use an overhead catenary or a third rail. The key advantage of the four-rail system is that neither running rail carries any current. This scheme was introduced because of the problems of return currents, intended to be carried by the earthed (grounded) running rail, flowing through the iron tunnel linings instead. This can cause electrolytic damage and even arcing if the tunnel segments are not electrically bonded together. The problem was exacerbated because the return current also had a tendency to flow through nearby iron pipes forming the water and gas mains. Some of these, particularly Victorian mains that predated London's underground railways, were not constructed to carry currents and had no adequate electrical bonding between pipe segments. The four-rail system solves the problem. Although the supply has an artificially created earth point, this connection is derived by using resistors which ensures that stray earth currents are kept to manageable levels. Power-only rails can be mounted on strongly insulating ceramic chairs to minimise current leak, but this is not possible for running rails which have to be seated on stronger metal chairs to carry the weight of trains. However, elastomeric rubber pads placed between the rails and chairs can now solve part of the problem by insulating the running rails from the current return should there be a leakage through the running rails. The Expo and Millennium Line of the Vancouver SkyTrain use side contact fourth-rail systems for their 650V DC supply. Both are located to the side of the train as the space between the running rails is occupied by an aluminum plate, as part of stator of the linear induction propulsion system used on the Innovia ART system. While part of the SkyTrain network, the Canada Line does not use this system and instead uses more traditional motors attached to the wheels and third rail electrification.


Rubber-tyred systems

A few lines of the Paris Métro in France operate on a four-rail power system. The trains move on rubber tyres which roll on a pair of narrow roll ways made of steel and, in some places, of concrete. Since the tyres do not conduct the return current, the two guide bars provided outside the running ' roll ways' become, in a sense, a third and fourth rail which each provide , so at least electrically it is a four-rail system. Each wheel set of a powered
bogie A bogie ( ) (in some senses called a truck in North American English) is a chassis or framework that carries a wheelset, attached to a vehicle—a modular subassembly of wheels and axles. Bogies take various forms in various modes of transp ...
carries one traction motor. A side sliding (side running) contact shoe picks up the current from the vertical face of each guide bar. The return of each traction motor, as well as each wagon, is effected by one contact shoe each that slide on top of each one of the running rails. This and all other
rubber-tyred metro A rubber-tyred metro or rubber-tired metro is a form of rapid transit system that uses a mix of road and rail technology. The vehicles have wheels with rubber tires that run on rolling pads inside guide bars for traction, as well as traditional ...
s that have a
track Track or Tracks may refer to: Routes or imprints * Ancient trackway, any track or trail whose origin is lost in antiquity * Animal track, imprints left on surfaces that an animal walks across * Desire path, a line worn by people taking the shorte ...
between the roll ways operate in the same manner.


Alternating current

Railways and electrical utilities use AC as opposed to DC for the same reason: to use transformers, which require AC, to produce higher voltages. The higher the voltage, the lower the current for the same power because Power = Current x voltage and power loss is proportional to the current squared. The lower current reduces line loss, thus allowing higher power to be delivered. As alternating current is used with high voltages, this method of electrification is only used on overhead lines, never on third rails for safety reasons. Inside the locomotive, a transformer steps the voltage down for use by the traction motors and auxiliary loads. An early advantage of AC is that the power-wasting
resistors A resistor is a passive two-terminal electrical component that implements electrical resistance as a circuit element. In electronic circuits, resistors are used to reduce current flow, adjust signal levels, to divide voltages, bias active el ...
used in DC locomotives for speed control were not needed in an AC locomotive: multiple taps on the transformer can supply a range of voltages. Separate low-voltage transformer windings supply lighting and the motors driving auxiliary machinery. More recently, the development of very high power semiconductors has caused the classic DC motor to be largely replaced with the three-phase
induction motor An induction motor or asynchronous motor is an AC electric motor in which the electric current in the rotor needed to produce torque is obtained by electromagnetic induction from the magnetic field of the stator winding. An induction mot ...
fed by a variable frequency drive, a special inverter that varies both frequency and voltage to control motor speed. These drives can run equally well on DC or AC of any frequency, and many modern electric locomotives are designed to handle different supply voltages and frequencies to simplify cross-border operation.


Low-frequency alternating current

Five European countries Germany, Austria, Switzerland, Norway and Sweden have standardized on 15kV Hz (the 50Hz mains frequency divided by three) single-phase AC. On 16 October 1995, Germany, Austria and Switzerland changed from Hz to 16.7Hz which is no longer exactly one-third of the grid frequency. This solved overheating problems with the rotary converters used to generate some of this power from the grid supply. In the US, the New York, New Haven, and Hartford Railroad, the
Pennsylvania Railroad The Pennsylvania Railroad (reporting mark PRR), legal name The Pennsylvania Railroad Company also known as the "Pennsy", was an American Class I railroad that was established in 1846 and headquartered in Philadelphia, Pennsylvania. It was named ...
and the Philadelphia and Reading Railway adopted 11kV 25Hz single-phase AC. Parts of the original electrified network still operate at 25Hz, with voltage boosted to 12kV, while others were converted to 12.5 or 25kV 60Hz. In the UK, the London, Brighton and South Coast Railway pioneered overhead electrification of its suburban lines in London,
London Bridge Several bridges named London Bridge have spanned the River Thames between the City of London and Southwark, in central London. The current crossing, which opened to traffic in 1973, is a box girder bridge built from concrete and steel. It r ...
to Victoria being opened to traffic on 1December 1909. Victoria to Crystal Palace via Balham and West Norwood opened in May 1911. Peckham Rye to West Norwood opened in June 1912. Further extensions were not made owing to the First World War. Two lines opened in 1925 under the Southern Railway serving Coulsdon North and Sutton railway station. The lines were electrified at 6.7kV 25Hz. It was announced in 1926 that all lines were to be converted to DC third rail and the last overhead-powered electric service ran in September 1929.


Standard frequency alternating current

25 kV AC is used at 60Hz on some US lines, in Saudi Arabia, western Japan, South Korea and Taiwan; and at 50Hz in a number of European countries, India, eastern Japan, countries that used to be part of the Soviet Union, on high-speed lines in much of Western Europe (including countries that still run conventional railways under DC but not in countries using 16.7Hz, see above). On "French system" HSLs, the overhead line and a "sleeper" feeder line each carry 25kV in relation to the rails, but in opposite phase so they are at 50kV from each other; autotransformers equalize the tension at regular intervals.


Three-phase alternating current

Various railway electrification systems in the late nineteenth and twentieth centuries utilised
three-phase Three-phase electric power (abbreviated 3φ) is a common type of alternating current used in electricity generation, Electric power transmission, transmission, and Electric power distribution, distribution. It is a type of polyphase system empl ...
, rather than single-phase electric power delivery due to ease of design of both power supply and locomotives. These systems could either use standard network frequency and three power cables, or reduced frequency, which allowed for return-phase line to be third rail, rather than an additional overhead wire.


Comparisons


AC versus DC for mainlines

The majority of modern electrification systems take AC energy from a power grid that is delivered to a locomotive, and within the locomotive, transformed and rectified to a lower DC voltage in preparation for use by traction motors. These motors may either be DC motors which directly use the DC or they may be three-phase AC motors which require further conversion of the DC to variable frequency three-phase AC (using power electronics). Thus both systems are faced with the same task: converting and transporting high-voltage AC from the power grid to low-voltage DC in the locomotive. The difference between AC and DC electrification systems lies in where the AC is converted to DC: at the substation or on the train. Energy efficiency and infrastructure costs determine which of these is used on a network, although this is often fixed due to pre-existing electrification systems. Both the transmission and conversion of electric energy involve losses: ohmic losses in wires and power electronics, magnetic field losses in transformers and smoothing reactors (inductors). Power conversion for a DC system takes place mainly in a railway substation where large, heavy, and more efficient hardware can be used as compared to an AC system where conversion takes place aboard the locomotive where space is limited and losses are significantly higher. However, the higher voltages used in many AC electrification systems reduce transmission losses over longer distances, allowing for fewer substations or more powerful locomotives to be used. Also, the energy used to blow air to cool transformers, power electronics (including rectifiers), and other conversion hardware must be accounted for. Standard AC electrification systems use much higher voltages than standard DC systems. One of the advantages of raising the voltage is that, to transmit certain level of power, lower current is necessary (). Lowering the current reduces the ohmic losses and allows for less bulky, lighter overhead line equipment and more spacing between traction substations, while maintaining power capacity of the system. On the other hand, the higher voltage requires larger isolation gaps, requiring some elements of infrastructure to be larger. The standard-frequency AC system may introduce imbalance to the supply grid, requiring careful planning and design (as at each substation power is drawn from two out of three phases). The low-frequency AC system may be powered by separate generation and distribution network or a network of converter substations, adding the expense, also low-frequency transformers, used both at the substations and on the rolling stock, are particularly bulky and heavy. The DC system, apart from being limited as to the maximum power that can be transmitted, also can be responsible for electrochemical corrosion due to stray DC currents.


Electric versus diesel


Energy efficiency

Electric trains need not carry the weight of prime movers, transmission and fuel. This is partly offset by the weight of electrical equipment. Regenerative braking returns power to the electrification system so that it may be used elsewhere, by other trains on the same system or returned to the general power grid. This is especially useful in mountainous areas where heavily loaded trains must descend long grades. Central station electricity can often be generated with higher efficiency than a mobile engine/generator. While the efficiency of power plant generation and diesel locomotive generation are roughly the same in the nominal regime, diesel motors decrease in efficiency in non-nominal regimes at low power while if an electric power plant needs to generate less power it will shut down its least efficient generators, thereby increasing efficiency. The electric train can save energy (as compared to diesel) by regenerative braking and by not needing to consume energy by idling as diesel locomotives do when stopped or coasting. However, electric rolling stock may run cooling blowers when stopped or coasting, thus consuming energy. Large fossil fuel power stations operate at high efficiency, and can be used for district heating or to produce
district cooling District cooling is the cooling equivalent of district heating. Working on broadly similar principles to district heating, district cooling delivers chilled water to buildings like offices and factories needing cooling. In winter, the source for t ...
, leading to a higher total efficiency. Electricity for electric rail systems can also come from
renewable energy Renewable energy is energy that is collected from renewable resources that are naturally replenished on a human timescale. It includes sources such as sunlight, wind, the movement of water, and geothermal heat. Although most renewable energy ...
, nuclear power, or other low-carbon sources, which do not emit pollution or emissions.


Power output

Electric locomotives may easily be constructed with greater power output than most diesel locomotives. For passenger operation it is possible to provide enough power with diesel engines (see e.g. ' ICE TD') but, at higher speeds, this proves costly and impractical. Therefore, almost all high speed trains are electric. The high power of electric locomotives also gives them the ability to pull freight at higher speed over gradients; in mixed traffic conditions this increases capacity when the time between trains can be decreased. The higher power of electric locomotives and an electrification can also be a cheaper alternative to a new and less steep railway if train weights are to be increased on a system. On the other hand, electrification may not be suitable for lines with low frequency of traffic, because lower running cost of trains may be outweighed by the high cost of the electrification infrastructure. Therefore, most long-distance lines in developing or sparsely populated countries are not electrified due to relatively low frequency of trains.


Network effect

Network effects are a large factor with electrification. When converting lines to electric, the connections with other lines must be considered. Some electrifications have subsequently been removed because of the through traffic to non-electrified lines. If through traffic is to have any benefit, time-consuming engine switches must occur to make such connections or expensive dual mode engines must be used. This is mostly an issue for long-distance trips, but many lines come to be dominated by through traffic from long-haul freight trains (usually running coal, ore, or containers to or from ports). In theory, these trains could enjoy dramatic savings through electrification, but it can be too costly to extend electrification to isolated areas, and unless an entire network is electrified, companies often find that they need to continue use of diesel trains even if sections are electrified. The increasing demand for container traffic, which is more efficient when utilizing the
double-stack car A well car, also known as a double-stack car (or also intermodal car/container car), is a type of railroad car specially designed to carry intermodal containers (shipping containers) used in intermodal freight transport. The "well" is a depresse ...
, also has network effect issues with existing electrifications due to insufficient clearance of overhead electrical lines for these trains, but electrification can be built or modified to have sufficient clearance, at additional cost. A problem specifically related to electrified lines are gaps in the electrification. Electric vehicles, especially locomotives, lose power when traversing gaps in the supply, such as phase change gaps in overhead systems, and gaps over points in third rail systems. These become a nuisance if the locomotive stops with its collector on a dead gap, in which case there is no power to restart. Power gaps can be overcome by on-board batteries or motor-flywheel-generator systems. In 2014, progress is being made in the use of large capacitors to power electric vehicles between stations, and so avoid the need for overhead wires between those stations.


Maintenance costs

Maintenance costs of the lines may be increased by electrification, but many systems claim lower costs due to reduced wear-and-tear on the track from lighter rolling stock. There are some additional maintenance costs associated with the electrical equipment around the track, such as power sub-stations and the catenary wire itself, but, if there is sufficient traffic, the reduced track and especially the lower engine maintenance and running costs exceed the costs of this maintenance significantly.


Sparks effect

Newly electrified lines often show a "sparks effect", whereby electrification in passenger rail systems leads to significant jumps in patronage / revenue. The reasons may include electric trains being seen as more modern and attractive to ride, faster, quieter and smoother service, and the fact that electrification often goes hand in hand with a general infrastructure and rolling stock overhaul / replacement, which leads to better service quality (in a way that theoretically could also be achieved by doing similar upgrades yet without electrification). Whatever the causes of the sparks effect, it is well established for numerous routes that have electrified over decades.


Double-stack rail transport

Due to the height restriction imposed by the overhead wires, double-stacked container trains have been traditionally difficult and rare to operate under electrified lines. However, this limitation is being overcome by railways in India, China and African countries by laying new tracks with increased catenary height. Such installations are in the Western Dedicated Freight Corridor in India where the wire height is at 7.45 metres to accommodate double-stack container trains without the need of well-wagons.


Advantages

* No exposure of passengers to exhaust from the locomotive * Lower cost of building, running and maintaining locomotives and
multiple unit A multiple-unit train or simply multiple unit (MU) is a self-propelled train composed of one or more carriages joined together, which when coupled to another multiple unit can be controlled by a single driver, with multiple-unit train contr ...
s * Higher power-to-weight ratio (no onboard fuel tanks), resulting in ** Fewer locomotives ** Faster acceleration ** Higher practical limit of power ** Higher limit of speed * Less noise pollution (quieter operation) * Faster acceleration clears lines more quickly to run more trains on the track in urban rail uses * Reduced power loss at higher altitudes (for ''power loss'' see Diesel engine) * Independence of running costs from fluctuating fuel prices * Service to underground stations where diesel trains cannot operate for safety reasons * Reduced environmental pollution, especially in highly populated urban areas, even if electricity is produced by fossil fuels * Easily accommodates kinetic energy brake reclaim using supercapacitors * More comfortable ride on multiple units as trains have no underfloor diesel engines * Somewhat higher energy efficiency in part due to regenerative braking and less power lost when "idling" * More flexible primary energy source: can use coal, natural gas, nuclear or renewable energy (hydro, solar, wind) as the primary energy source instead of diesel fuel * If the entire network is electrified, diesel infrastructure such as fueling stations, maintenance yards and indeed the diesel locomotive fleet can be retired or put to other uses - this is often the business case in favor of electrifying the last few lines in a network where otherwise costs would be too high. Having only one type of motive power also allows greater fleet homogeneity which can also reduce costs.


Disadvantages

* Electrification cost: electrification requires an entire new infrastructure to be built around the existing tracks at a significant cost. Costs are especially high when tunnels, bridges and other obstructions have to be altered for clearance. Another aspect that can raise the cost of electrification are the alterations or upgrades to railway signalling needed for new traffic characteristics, and to protect signalling circuitry and track circuits from interference by traction current. Electrification may require line closures while the new equipment is being installed. * Appearance: the overhead line structures and cabling can have a significant landscape impact compared with a non-electrified or third rail electrified line that has only occasional signalling equipment above ground level. * Fragility and vulnerability: overhead electrification systems can suffer severe disruption due to minor mechanical faults or the effects of high winds causing the pantograph of a moving train to become entangled with the catenary, ripping the wires from their supports. The damage is often not limited to the supply to one track, but extends to those for adjacent tracks as well, causing the entire route to be blocked for a considerable time. Third-rail systems can suffer disruption in cold weather due to ice forming on the conductor rail. * Theft: the high scrap value of copper and the unguarded, remote installations make overhead cables an attractive target for scrap metal thieves. Attempts at theft of live 25kV cables may end in the thief's death from electrocution. In the UK, cable theft is claimed to be one of the biggest sources of delay and disruption to train services – though this normally relates to signalling cable, which is equally problematic for diesel lines. * Incompatibility: Diesel trains can run on any track without electricity or with any kind of electricity ( third rail or overhead line, DC or AC, and at any voltage or frequency). Not so for electric trains, which can never run on non-electrified lines, and which even on electrified lines can run only on the single, or the few, electrical system(s) for which they are equipped. Even on fully electrified networks, it is usually a good idea to keep a few diesel locomotives for maintenance and repair trains, for instance to repair broken or stolen overhead lines, or to lay new tracks. However, due to ventilation issues, diesel trains may have to be banned from certain tunnels and underground train stations mitigating the advantage of diesel trains somewhat. * Birds may perch on parts with different charges, and animals may also touch the electrification system. Dead animals attract foxes or other scavengers, bringing risk of collision with trains. * In most of the world's railway networks, the height clearance of overhead electrical lines is not sufficient for a double-stack container car or other unusually tall loads. To upgrade electrified lines to the correct clearances () to take double-stacked container trains, besides renewing bridges over it, would normally mean need for special
pantographs A pantograph (, from their original use for copying writing) is a mechanical linkage connected in a manner based on parallelograms so that the movement of one pen, in tracing an image, produces identical movements in a second pen. If a line dr ...
violating standardisation and requiring custom made vehicles.


World electrification

As of 2012, electrified tracks account for nearly one third of total tracks globally. As of 2018, there were of railways electrified at 25kV, either 50 or 60Hz; electrified at ; electrified at 15kV 16.7 or Hz and electrified at . The Swiss rail network is the largest fully electrified network in the world and one of only two to achieve this, the other being Armenia. China has the largest electrified railway length with just over 70% of the network. A number of countries have zero electrification length. Several countries have announced plans to electrify all or most of their railway network such as Indian Railways and Israel Railways. The Trans-Siberian Railway mainly in Russia is completely electrified, making it one of the longest stretches of electrified railways in the world.


See also

* Battery electric multiple unit *
Battery locomotive An electric locomotive is a locomotive powered by electricity from overhead lines, a third rail or on-board energy storage such as a battery or a supercapacitor. Locomotives with on-board fuelled prime movers, such as diesel engines or gas tur ...
* Conduit current collection * Current collector *
Dual electrification Dual electrification is a system whereby a railway line is supplied power both via overhead catenary and a third rail. This is done to enable trains that use either system of power to share the same railway line, for example in the case of mainlin ...
* Electromote * Fifth rail system * Ground-level power supply * History of the electric locomotive * Initial Electrification Experiments NY NH HR * List of railway electrification systems * List of tram systems by gauge and electrification * Multi-system (rail) * Overhead conductor rails * Railroad electrification in the United States *
Stud contact system The stud contact system is an obsolete ground-level power supply system for electric trams. Power supply studs were set in the road at intervals and connected to a buried electric cable by switches operated by magnets on the tramcars. Current was ...
* Traction current pylon *
Traction powerstation A traction power station is a power station that produces only traction current, that is, electric current used for railways, trams, trolleybuses or other conveyances. Pure traction power stations are rare and there are many more power stations tha ...
* Traction substation


References


Further reading

* * * * * * * * *


Sources


English

* * Gomez-Exposito A., Mauricio J.M., Maza-Ortega J.M. "VSC-based MVDC Railway Electrification System" IEEE transactions on power delivery, v. 29, no. 1, Feb. 2014 pp.422–431. (suggests 24 kV DC)
(Jane's) Urban Transit Systems
* * *


Russian

* Винокуров В.А., Попов Д.А. "Электрические машины железно-дорожного транспорта" (Electrical machinery of railroad transportation), Москва, Транспорт, 1986. , 520 pp. * Дмитриев, В.А., "Народнохозяйственная эффективность электрификации железных дорог и применения тепловозной тяги" (National economic effectiveness of railway electrification and application of diesel traction), Москва, Транспорт 1976. * Дробинский В.А., Егунов П.М. "Как устроен и работает тепловоз" (How the diesel locomotive works) 3rd ed. Moscow, Транспорт, 1980. * Иванова В.Н. (ed.) "Конструкция и динамика тепловозов" (Construction and dynamics of the diesel locomotive). Москва, Транспорт, 1968 (textbook). * Калинин, В.К. "Электровозы и электропоезда" (Electric locomotives and electric train sets) Москва, Транспорт, 1991 * Мирошниченко, Р.И., "Режимы работы электрифицированных участков" (Regimes of operation of electrified sections f railways, Москва, Транспорт, 1982. * Перцовский, Л. М.; "Энергетическая эффективность электрической тяги" (Energy efficiency of electric traction), ''Железнодорожный транспорт'' (magazine), #12, 1974 p.39+ * Плакс, А.В. & Пупынин, В. Н., "Электрические железные дороги" (Electric Railways), Москва "Транспорт" 1993. * Сидоров Н.И., Сидорожа Н.Н. "Как устроен и работает электровоз" (How the electric locomotive works) Москва, Транспорт, 1988 (5th ed.). 233 pp, . 1980 (4th ed.). * Хомич А.З. Тупицын О.И., Симсон А.Э. "Экономия топлива и теплотехническая модернизация тепловозов" (Fuel economy and the thermodynamic modernization of diesel locomotives). Москва: Транспорт, 1975. 264 pp.


External links

* {{DEFAULTSORT:Railway electrification system *